New Mexico Administrative Code
Title 19 - NATURAL RESOURCES AND WILDLIFE
Chapter 8 - COAL MINING
Part 11 - REVIEW, PUBLIC PARTICIPATION, AND APPROVAL OR DISAPPROVAL OF PERMIT APPLICATIONS, TERMS AND CONDITIONS
Section 19.8.11.1108 - CRITERIA FOR PERMIT APPROVAL OR DENIAL: EXISTING STRUCTURES

Universal Citation: 19 NM Admin Code 19.8.11.1108

Current through Register Vol. 35, No. 18, September 24, 2024

A. No application for a permit or revision which proposes to use an existing structure in connection with or to facilitate the proposed surface coal mining and reclamation operation shall be approved, unless the applicant demonstrates and the director finds, in writing, on the basis of information set forth in the complete application that the structure meets the performance standards of the act and 19.8.19 through 28 NMAC.

B. If the director finds that the structure does not meet the requirements of Subsection A of 19.8.11.1108 NMAC, the director shall require the applicant to submit a compliance plan for modification or reconstruction of the structure and shall find prior to the issuance of the permit that:

(1) the modification or reconstruction of the structure will bring the structure into compliance with the design and performance standards of 19.8.19 through 19.8.28 NMAC as soon as possible, but not later than six months after issuance of the permit;

(2) the risk of harm to the environment or to public health or safety is not significant during the period of modification or reconstruction; and

(3) the applicant will monitor the structure to determine compliance with the performance standards of 19.8.19 through 19.8.28 NMAC.

C. Should the director find that the existing structure cannot be reconstructed without causing significant harm to the environment or public health or safety consistent with 19.8.20.2079 NMAC, the applicant will be required to abandon the existing structure. The structure shall not be used for or to facilitate surface coal mining operations after the effective date of issuance of the permanent regulatory program permit. Abandonment of the structure shall proceed on a schedule approved by the director.

Disclaimer: These regulations may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.