New Mexico Administrative Code
Title 19 - NATURAL RESOURCES AND WILDLIFE
Chapter 8 - COAL MINING
Part 11 - REVIEW, PUBLIC PARTICIPATION, AND APPROVAL OR DISAPPROVAL OF PERMIT APPLICATIONS, TERMS AND CONDITIONS
Section 19.8.11.1108 - CRITERIA FOR PERMIT APPROVAL OR DENIAL: EXISTING STRUCTURES
Current through Register Vol. 35, No. 18, September 24, 2024
A. No application for a permit or revision which proposes to use an existing structure in connection with or to facilitate the proposed surface coal mining and reclamation operation shall be approved, unless the applicant demonstrates and the director finds, in writing, on the basis of information set forth in the complete application that the structure meets the performance standards of the act and 19.8.19 through 28 NMAC.
B. If the director finds that the structure does not meet the requirements of Subsection A of 19.8.11.1108 NMAC, the director shall require the applicant to submit a compliance plan for modification or reconstruction of the structure and shall find prior to the issuance of the permit that:
C. Should the director find that the existing structure cannot be reconstructed without causing significant harm to the environment or public health or safety consistent with 19.8.20.2079 NMAC, the applicant will be required to abandon the existing structure. The structure shall not be used for or to facilitate surface coal mining operations after the effective date of issuance of the permanent regulatory program permit. Abandonment of the structure shall proceed on a schedule approved by the director.