Section 19.27.1.20 - REQUIREMENTS AFTER COMPLETION OF WELL

Universal Citation: 19 NM Admin Code 19.27.1.20
Current through Register Vol. 35, No. 18, September 24, 2024

As soon as practicable after completing the well and the application of water to the intended use pursuant to the permit, the applicant shall have prepared and file a "final inspection and report" in triplicate on forms provided by the state engineer. The final report shall be accompanied by a plat prepared in accordance with Article 5 [now 19.25.3 NMAC]. The final inspection and report shall be prepared by a registered professional engineer and land surveyor or by a registered land surveyor as specified by the state engineer.

Disclaimer: These regulations may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.