New Mexico Administrative Code
Title 19 - NATURAL RESOURCES AND WILDLIFE
Chapter 15 - OIL AND GAS
Part 6 - TAX INCENTIVES
Section 19.15.6.7 - DEFINITIONS
Current through Register Vol. 35, No. 24, December 23, 2024
A. "Average daily production" means the number derived by dividing the total volume of oil or gas production from the stripper well property reported to the division during a calendar year by the sum of the number of days each eligible well within the property produced or injected during that calendar year.
B. "Eligible well" means an oil or gas well that produces or an injection well that injects and is integral to production, for any period of time during the preceding calendar year.
C. "Expansion or expanded use" means a significant change or modification as the division determines in:
D. "Operator":
E. "Positive production response" means that the rate of oil production from the wells or pools an EOR project affects is greater than the rate that would have occurred without the project.
F. "Project area" means a pool or a portion of a pool that EOR operations directly affect.
G. "Primary recovery" means the displacement of oil from an oil well or division-designated pool into the well bore by means of the natural pressure of the oil well or pool, including artificial lift.
H. "Production restoration incentive tax exemption" means the severance tax exemption for natural gas or oil produced from an approved production restoration project found in NMSA 1978, Section 7-29-4.
I. "Production restoration project" means returning to production a gas or oil well, including an injection well that has previously produced, which had no more than 30 days of production in a period of 24 consecutive months beginning on or after January 1, 1993 the division has approved and certified.
J. "Recovered oil tax rate" means the tax rate set forth in NMSA 1978, Section 7-29-4, on oil produced from an EOR project.
K. "Routine maintenance" means repair or like-for-like replacement of downhole equipment or other procedure an operator performs to maintain the well's current production.
L. "Secondary recovery project" means an EOR project that:
M. "Stripper well property" means an oil or gas producing property that the taxation and revenue department assigns a single production unit number (PUN) and:
N. "Stripper well incentive tax rates" means the tax rates set for stripper well properties by NMSA 1978, Sections 7-29-4 and 7-31-4.
O. "Termination" means the operator's discontinuance of an EOR project.
P. "Tertiary recovery project" means an EOR project that:
Q. "Well" means a well bore with single or multiple completions, including all horizons and producing formations from the surface to total depth.
R. "Well workover incentive tax rate" means the tax rate NMSA 1978, Section 7-29-4 imposes on gas or oil produced from a well workover project.
S. "Well workover project" means a procedure the operator of a gas or oil well undertakes that is intended to increase production from the well and that the division has approved and certified.
T. "Workover" means a procedure the operator undertakes that is intended to increase production but is not routine maintenance and includes: