New Mexico Administrative Code
Title 19 - NATURAL RESOURCES AND WILDLIFE
Chapter 15 - OIL AND GAS
Part 20 - OIL PRORATION AND ALLOCATION
Section 19.15.20.10 - AUTHORIZATION FOR PRODUCTION OF OIL
Current through Register Vol. 35, No. 18, September 24, 2024
A. Except as provided below, the daily top proration unit allowable for an oil pool is 100 percent of the depth bracket allowable for the pool determined pursuant to 19.15.20.12 NMAC.
B. The division may, within five days prior to the end of the month, determine the likelihood the total producing capacity of all oil wells in the state exceeding anticipated reasonable market demand for oil from the state. If the division determines that the capacity may exceed the anticipated reasonable market demand, and that a market demand factor of less than 100 percent may be necessary to prevent waste, it shall immediately institute proper proceedings for a hearing to be held before the 20th day of the following month to determine actual reasonable market demand up to a maximum of six months.
C. At the hearing the division shall consider all evidence of market demand for oil from this state, and if it determines that the market demand percentage factor should be less than 100 percent, issue an order establishing the market demand factor and set a date for the next market demand hearing.
D. The division shall multiply the market demand factor established by the applicable depth bracket allowable for each well and each pool to determine its unit allowable. A fraction of a barrel is regarded as a full barrel in determining top proration unit allowable. Upon initial establishment of a market demand factor, and from time to time thereafter, the division shall issue a proration schedule authorizing the production of oil from the various proration units in the various pools in the state. A well completed or recompleted after the schedule's issuance and for which the division has approved form C-104, shall, by supplement to the schedule, be authorized a daily allowable equal to the top proration unit allowable in effect. The allowable for the well is effective at 7:00 a.m. on the date of the completion, provided the operator submits form C-104 and the division approves the form within 10 days following the completion date; otherwise the allowable is effective on the date the division approves the form C-104.
E. A non-marginal unit may produce the top proration unit allowable without waste and subject to the provisions of 19.15.18.7 NMAC, 19.15.20.9 NMAC and 19.15.20.13 NMAC and all other applicable rules.
F. A marginal unit may produce any amount of oil that it is capable of producing without waste up to the pool's top proration unit allowable, subject to the provisions of 19.15.18.7 NMAC, 19.15.20.9 NMAC and 19.15.20.13 NMAC and all other applicable rules if the division has assigned an allowable to the unit to authorize the production.
G. A penalized non-marginal unit is a proration unit to which, because of an excessive gas-oil ratio, the division has assigned an allowable determined in accordance with the procedure in 19.15.20.13 NMAC. In calculating a penalized allowable, a fraction of a barrel is regarded as a full barrel.
H. The division shall make and distribute a periodic tabulation of all supplements to the current proration schedule.
I. The division shall adhere to 19.15.15.14 NMAC in fixing top proration unit allowables.
J. If it becomes necessary for an oil transporter to resort to pipeline proration, the transporter shall, as soon as possible and not later than 24 hours after the effective date of the pipeline proration, notify the division of its decision to prorate. Upon receipt of the notice from the transporter, the division may take such emergency action as it deems proper or upon its own motion, after notice, hold a hearing for the purpose of considering any action within its authority to preserve and protect correlative rights.
K. In case of pipeline proration an operator the pipeline proration affects may apply to the division for authorization to have an underproduction resulting from the pipeline proration included in subsequent proration schedules. The operator shall apply upon a division-prescribed form and file it with the division within 30 days after the close of the first proration period in which the pipeline proration underproduction occurred. The authorization is limited to wells capable of producing the daily top proration unit allowable for the period.
L. In approving the application the division shall determine the time period during which the underproduction shall be made up without injury to the well or pool, and shall include the time period in the regularly approved proration schedules following the pipeline proration's conclusion.