New Mexico Administrative Code
Title 19 - NATURAL RESOURCES AND WILDLIFE
Chapter 15 - OIL AND GAS
Part 15 - WELL SPACING AND LOCATION
Section 19.15.15.12 - Special rules for multiple operators within a spacing unit
Current through Register Vol. 35, No. 24, December 23, 2024
A. Allowable production. If an operator completes a well in an oil pool or prorated gas pool, located within a proration unit containing an existing well or wells producing from that pool and operated by a different operator, unless all operators of wells producing from that proration unit agree, the allowable production from the newly completed well shall not exceed the difference between the allowable production for the proration unit and the actual production from the pool of the existing well or wells within the proration unit. The division may authorize exceptions to Subsection A of 19.15.15.12 NMAC after hearing following appropriate notice.
B. Notice requirements.
C. Transfer of wells. If an operator transfers operation of less than all its wells located within a spacing or proration unit to another operator, and the spacing unit includes state, federal or tribal minerals, the operator shall, prior to filing form C-145 to effectuate the transfer, notify in writing the state land office or BLM, as applicable, of the transfer.
D. Compulsory pooled units. No provision of 19.15.15 NMAC authorizes the operation of a producing well within a unit described in an existing compulsory pooling order by an operator other than the operator designated in the order.
E. Federal or state exploratory units. No provision of 19.15.15 NMAC authorizes a producing well's operation within a federal exploratory unit or state exploratory unit by an operator other than the unit's designated operator except as provided by BLM regulations or state land office rules applicable to the unit.