New Mexico Administrative Code
Title 19 - NATURAL RESOURCES AND WILDLIFE
Chapter 11 - GEOTHERMAL RESOURCES DEVELOPMENT
Part 4 - CONSTRUCTION AND OPERATION
- Section 19.11.4.1 - ISSUING AGENCY
- Section 19.11.4.2 - SCOPE
- Section 19.11.4.3 - STATUTORY AUTHORITY
- Section 19.11.4.4 - DURATION
- Section 19.11.4.5 - EFFECTIVE DATE
- Section 19.11.4.6 - OBJECTIVE
- Section 19.11.4.7 - DEFINITIONS: [RESERVED]
- Section 19.11.4.8 - GEOTHERMAL WELL LOCATION LIMITATIONS
- Section 19.11.4.9 - PERMITTEE'S NOTIFICATION REQUIREMENTS AND REQUESTS FOR APPROVAL TO DIVISION
- Section 19.11.4.10 - WELL CONSTRUCTION AND CASING REQUIREMENTS
- Section 19.11.4.11 - BLOWOUT PREVENTION
- Section 19.11.4.12 - OPERATING LIMITATIONS
- Section 19.11.4.13 - TESTING AND MONITORING
- Section 19.11.4.14 - RECORDKEEPING AND REPORTING
- Section 19.11.4.15 - GEOTHERMAL SURFACE FACILITIES
- Section 19.11.4.16 - PLUGGING AND ABANDONMENT
- Section 19.11.4.17 - PIT AND CLOSED LOOP DESIGN, CONSTRUCTION AND OPERATING PLAN AND CLOSURE-REMEDIATION PLAN REQUIREMENTS
- Section 19.11.4.18 - TABLE 1 - CLOSURE CRITERIA FOR SOILS BENEATH DRYING PADS ASSOCIATED WITH CLOSED-LOOP SYSTEMS
- Section 19.11.4.19 - TABLE 2 - CLOSURE CRITERIA FOR GEOTHERMAL WASTE LEFT IN PLACE IN PITS
- Section 19.11.4.20 - DISPOSAL OF GEOTHERMAL RESOURCES, RESIDUE OF GEOTHERMAL RESOURCES OR NONDOMESTIC WASTE FROM THE EXPLORATION, DEVELOPMENT OR PRODUCTION OF GEOTHERMAL RESOURCES
Current through Register Vol. 35, No. 18, September 24, 2024
Disclaimer: These regulations may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.