New Mexico Administrative Code
Title 18 - TRANSPORTATION AND HIGHWAYS
Chapter 27 - HIGHWAY CONSTRUCTION GENERAL PROVISIONS
Part 6 - TRANSPORTATION PROJECT FUND
Section 18.27.6.15 - DESIGN/BIDDING/CONSTRUCTION

Universal Citation: 18 NM Admin Code 18.27.6.15

Current through Register Vol. 35, No. 18, September 24, 2024

A. A transportation project that is located in full or in part within a department right-of-way or NHS route eligible entity must be administered in accordance with the "Tribal/Local Public Agency Handbook".

B. A transportation project that ties into or crosses a department right-of-way or an NHS route, or when the project may have an effect on existing improvements within department rights-of-way, requires the approval of the department as evidenced by either a letter of approval or letter of authorization from the district engineer for the district where the project is located. The eligible entity shall contact the appropriate district engineer to determine if either is needed for the project. The district engineer will conduct a review of the project and determine whether the project requires a letter of approval or a letter of authorization from the department. If the district engineer determines the project does not require a letter of authorization, the district engineer, or designee, will submit a letter of approval to the eligible entity. If the district engineer determines the project requires a letter of authorization, the eligible entity must enter into a project agreement with the department before any grant funding will be distributed. The eligible entity shall cause the project to be constructed in compliance with any and all department designated standards, conditions and criteria as specified in the project agreement.

C. For transportation projects funded entirely by the fund, or in combination with local funds, and no Federal-aid funds are involved, the following apply:

(1) It will be the eligible entity's responsibility to ensure compliance with any and all state, local and federal regulations including the Americans with Disabilities Act (ADA) and laws regarding noise ordinances, air quality, surface water quality, ground water quality, threatened and endangered species, hazardous materials, historic and cultural properties, and cultural resources. The department will not be involved in permit preparation, review, or coordination with the regulatory agencies. However, the eligible entity shall provide to the district where the project is located a copy of any permit identified by the department in the project feasibility form.

(2) Projects on locally owned roadways are to be designed in accordance with the eligible entity's established design standards. The eligible entity is responsible for ensuring that the plans, specifications and estimates meet applicable design criteria and standards. The department will not perform any detailed technical reviews of project design and related documents.

D. In accordance with Section 67-3-62 NMSA 1978, any transportation projects for constructing highways along new alignments or for purposes of substantially widening highways along the existing alignments must consider provisions for pedestrian, bicycle, and equestrian facilities concurrent with the design of the project.

E. Pursuant to Section 61-23-26 NMSA 1978, all transportation projects involving engineering requires the engineering to be under the responsible charge of a licensed professional engineer.

F. The eligible entity will be responsible for advertising the project for construction bids and for receiving and publicly opening bids received for the project. The department will have no involvement in the bidding process.

G. The eligible entity shall follow its normal procedures for award of the contract and assure that all applicable requirements are followed. The eligible entity shall retain the executed contract, document the award date, and the preconstruction conference minutes as part of the project files. The department will have no involvement in the award of the contract and will not participate in resolving any disputes between the eligible entity and its bidders.

H. The eligible entity will have the responsibility and control of the construction phase and resulting quality of the completed work. The department will have no involvement in the construction phase other than its discretionary ability to periodically monitor the implementation of the project, and will not participate in resolving any disputes between the eligible entity and its contractor.

I. Department personnel will not conduct periodic assurance inspections or comparison material testing. The department, at its discretion, may perform a final inspection upon project completion.

Disclaimer: These regulations may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.