New Mexico Administrative Code
Title 17 - PUBLIC UTILITIES AND UTILITY SERVICES
Chapter 9 - ELECTRIC SERVICES
Part 568 - INTERCONNECTION OF GENERATING FACILITIES WITH A NAMEPLATE RATING UP TO AND INCLUDING 10 MW CONNECTING TO A UTILITY SYSTEM
Section 17.9.568.8 - APPLICABILITY

Universal Citation: 17 NM Admin Code 17.9.568.8
Current through Register Vol. 35, No. 18, September 24, 2024

All generating facilities that operate in parallel with the utility electric power system are required to have an interconnection review and an interconnection agreement to ensure safety, system reliability, and operational compatibility. These interconnection procedures are applicable to all state-jurisdictional interconnections of generating facilities with a rated capacity up to and including 10 megawatts (MW). Generating facilities with a rated capacity greater than 10 megawatts (MW) shall be conducted pursuant to 17.9.569 NMAC. Neither these procedures nor the requirements included hereunder apply to generating facilities interconnected or approved for interconnection prior to the effective date of these procedures.

Disclaimer: These regulations may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.