New Mexico Administrative Code
Title 17 - PUBLIC UTILITIES AND UTILITY SERVICES
Chapter 9 - ELECTRIC SERVICES
Part 568 - INTERCONNECTION OF GENERATING FACILITIES WITH A NAMEPLATE RATING UP TO AND INCLUDING 10 MW CONNECTING TO A UTILITY SYSTEM
Section 17.9.568.2 - SCOPE
Current through Register Vol. 35, No. 18, September 24, 2024
A. This rule, and the definitions, standards, procedures and screening processes described herein apply to every electric utility including rural electric cooperatives and investor-owned utilities operating within the state of New Mexico that are subject to the jurisdiction of the New Mexico public regulation commission. These standards and procedures apply to both qualifying and non-qualifying facilities.
B. The standards and procedures described in this rule (17.9.568 NMAC) apply only to the interconnection of generating facilities with a nameplate rated capacity up to and including 10 MW. The standards and procedures described in 17.9.569 NMAC apply to the interconnection of generating facilities with a rated capacity greater than 10 MW and are unchanged by this rule.
C. Interconnection requests are reviewed based on the combined nameplate ratings of systems accounting for their export capacity and energy storage operating mode. For purposes of review screens, only the capacity that is designed to inject electricity to the utility's distribution or transmission system, other than inadvertent exports and fault contribution, will be used.
D. All interconnection contracts between a utility and an interconnection customer existing at the time 17.9.568 NMAC is revised and adopted shall automatically continue in full force and effect. Material modifications to existing facilities or operations require a new interconnection application and agreement and will be subject to review under the current conditions of the electric power system. Any changes made to existing interconnection agreements shall conform to the provisions of 17.9.568 NMAC in effect at the time modification is executed.