The following EFDA procedures are allowable under direct supervision as set forth in 16.5.46.8 NMAC.

A. Placing and shaping of direct restorative materials into cavity preparations completed by a dentist; EFDA may use instrumentation as necessary and proper for this purpose.

B. Taking of impressions for permanent fixed or removable prosthetics involving single teeth, to include digital impressions. These include single crowns or single tooth replacement prosthetics. EFDA shall NOT take final impressions for multiple units of single crowns, bridges, cast framework partial dentures or full dentures final impressions.

C. Cement permanent or provisional restorations with temporary or provisional cement, provided the permanent cementation will be completed or monitored by the dentist within six months.

D. Place pit and fissure sealants under supervision as certification or licensure allows.

E. Place temporary or sedative restorations in open carious lesions after hand excavation of gross decay and debris. If pain is perceived by the patient dentist shall evaluate lesion before completion by EFDA. The EFDA shall NOT use any automated method to clean out the lesion or prepare the tooth, including but not limited to high speed, slow speed, air abrasion, ultrasonic, laser etc.

F. The EFDA may place temporary or sedative restorative material into unprepared tooth fractures as a palliative measure. The EFDA shall NOT use any automated method to clean out the fracture or prepare the tooth, including but not limited to high speed, slow speed, air abrasion, ultrasonic, laser etc.

G. Remove residual orthodontic bracket or band cement or resin from teeth after the brackets or bands have been removed by the dentist performing the orthodontic treatment, or to prepare the tooth or teeth for re-cementation of a debonded bracket or band. This removal of cement/resin may include the use of instrumentation, as necessary and proper for this purpose.

H. Perform preliminary fitting and shaping of stainless steel crowns which shall undergo final evaluation and cementation by a dentist.

I. In emergency situation recement temporary or permanent crowns or bridges using provisional cement under the general supervision of a dentist and when instructed to do so by the dentist provided the permanent cementation will be completed or monitored by the dentist within six months.

Disclaimer: These regulations may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.