Section 14.9.4.28 - REMOVABLE INSULATION

Universal Citation: 14 NM Admin Code 14.9.4.28
Current through Register Vol. 35, No. 18, September 24, 2024

If upon external inspection there is evidence of a leak or crack, enough of the covering of the boiler shall be removed as the inspector shall deem necessary to determine the safety of the boiler. If the covering cannot be removed at that time, the inspector may order the operation of the boiler suspended until such time as the covering can be removed and proper examination made.

Disclaimer: These regulations may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.