New Jersey Administrative Code
Title 7 - ENVIRONMENTAL PROTECTION
Chapter 9D - WELL CONSTRUCTION AND MAINTENANCE; SEALING OF ABANDONED WELLS
Subchapter 3 - REQUIREMENTS AND PROCEDURES FOR THE DECOMMISSIONING OF WELLS AND BOREHOLES
Section 7:9D-3.3 - Specific requirements for the decommissioning of hand dug wells

Universal Citation: NJ Admin Code 7:9D-3.3

Current through Register Vol. 56, No. 18, September 16, 2024

(a) Water shall be pumped from the well in order to ensure that no debris lies at the bottom of the well and to minimize settlement of the fill material.

(b) The total depth of the well shall be sealed using one of the following methods:

1. The entire well shall be sealed in accordance with 7:9D-3.1 using only cement-based sealing materials; or

2. The well shall be filled with sand or gravel to three feet from the land surface. The sand or gravel shall be thoroughly tamped. The remainder of the well shall be filled in with top soil. Additional top soil shall be mounded over the well to allow for settlement.

Disclaimer: These regulations may not be the most recent version. New Jersey may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.