New Jersey Administrative Code
Title 7 - ENVIRONMENTAL PROTECTION
Chapter 7A - FRESHWATER WETLANDS PROTECTION ACT RULES
Subchapter 7 - GENERAL PERMITS
Section 7:7A-7.6 - General permit 6- Non-tributary wetlands
Current through Register Vol. 56, No. 24, December 18, 2024
(a) General permit 6 authorizes regulated activities in freshwater wetlands and/or State open waters, if the freshwater wetlands and/or State open waters are not part of a surface water tributary system discharging into an inland lake or pond, or a river or stream, provided all applicable requirements at N.J.A.C. 7:7A-5.7 and 20.3 are met and:
(b) Mitigation shall be performed for all permanent loss and/or disturbance of 0.1 acres or greater of freshwater wetlands or State open waters that are also waters of the United States. Mitigation shall be performed for permanent loss and/or disturbance of less than 0.1 acres of freshwater wetlands or State open waters that are also waters of the United States unless the applicant demonstrates to the Department that all activities have been designed to avoid and minimize impacts to wetlands. For purposes of this subsection, "minimize" means that the project is configured so that most or all of it is contained in the uplands on the site, and that the wetlands are avoided to the greatest extent possible. An applicant is not required to reduce the scope of the project or to consider offsite alternatives to comply with this requirement.