New Jersey Administrative Code
Title 7 - ENVIRONMENTAL PROTECTION
Chapter 26E - TECHNICAL REQUIREMENTS FOR SITE REMEDIATION
Subchapter 5 - REMEDIAL ACTION
Section 7:26E-5.3 - Remedial action requirements for residences, schools, and child care centers
Current through Register Vol. 56, No. 18, September 16, 2024
(a) For any remediation initiated on or after May 7, 2010, when new construction of, or a change in use to, a residence, a school, or child care center will occur, the person responsible for conducting remediation shall implement at that area of concern:
(b) For any remediation initiated on or after May 7, 2010, when new construction of, or a change in use to, a residence, a school, or a child care center will occur, the person responsible for conducting the remediation shall, except as provided in (c) below, implement an unrestricted use remedial action or a presumptive remedy in the following two situations:
(c) For any remediation initiated on or after May 7, 2010, when new construction of, or a change in use to, a residence, a school, or a child care center will occur, when the person responsible for conducting the remediation determines not to use an unrestricted use remedial action or a presumptive remedy, the person responsible for conducting the remediation shall:
(d) For any remediation initiated on or after May 7, 2010, when new construction of, or a change in use to, a residence, a school, or a child care center will occur, the person responsible for conducting the remediation shall submit a remedial action workplan pursuant to N.J.A.C. 7:26E-5.5 and obtain the Department's written approval before implementing a remedial action at any area of concern:
(e) The new construction of, or change in use to, a single family residence, school, or child care center is prohibited on a landfill that undergoes remediation initiated on or after May 7, 2010, if engineering controlsare required for the management of landfill gas or leachate.
Table 5-1 |
||||
Presumptive Remedies for Soil Contamination at Schools, Child Care Centers, and Residences |
||||
Contamination |
Subcategories/Scenarios |
Presumptive |
Remedial |
Remedial |
Type |
Remedy/Remediation |
Action - |
Action - |
|
Goal |
Schools, Child |
Type I |
||
Care Centers, |
Residential |
|||
and Type II |
||||
Residential |
||||
Historic Fill |
Play |
Restricted |
Option #1. Barrier |
Same |
and/or all other |
Areas-Loose |
Use |
- Minimum of one foot |
engineering |
discharged |
Fill Surface |
clean loose fill |
control |
|
contaminants not |
(for example, |
material; Buffer |
requirement as |
|
otherwise |
mulch, sand, |
- Minimum of one foot |
Schools, Child |
|
excluded in |
etc.) |
clean loose fill |
Care Centers |
|
N.J.A.C. |
material; |
and Type II |
||
7:26E-5.3 |
Demarcation - |
Residential |
||
Geotextile fabric; |
||||
and Inspection - |
||||
Quarterly. Option |
||||
#2. Barrier - |
||||
Minimum of two feet |
||||
clean loose fill |
||||
material; Buffer |
||||
- Minimum of two feet |
||||
clean loose fill |
||||
material; |
||||
Demarcation - |
||||
Visible contamination |
||||
boundary marker or |
||||
geotextile fabric; |
||||
and Inspection - |
||||
Semi-annual. |
||||
Historic Fill |
Play |
Restricted |
Option #1. Barrier |
Same |
and/or all other |
Areas-Unitary |
Use |
- Proposed surface of |
engineering |
discharged |
Material |
unitary material and |
control |
|
contaminants not |
Surface (for |
a minimum of six |
requirement as |
|
otherwise |
example, |
inches crushed stone; |
Schools, Child |
|
excluded in |
Tile, Rubber |
Buffer - Minimum |
Care Centers |
|
N.J.A.C. |
Mat, |
of six inches crushed |
and Type II |
|
7:26E-5.3 |
Artificial |
stone; Demarcation |
Residential |
|
Turf) |
- Geotextile fabric; |
|||
and Inspection - |
||||
Annual. Option #2. |
||||
Barrier - |
||||
Proposed surface of |
||||
unitary material and |
||||
a minimum of four |
||||
inches of concrete or |
||||
asphalt; Buffer |
||||
- Four inches of sub |
||||
base; Demarcation |
||||
- Visible |
||||
contamination |
||||
boundary marker; and |
||||
Inspection - |
||||
Annual. Option #3. |
||||
Barrier - |
||||
Proposed surface of |
||||
unitary material and |
||||
a minimum of one foot |
||||
clean fill; Buffer |
||||
- Minimum of one foot |
||||
clean fill; |
||||
Demarcation - |
||||
Visible contamination |
||||
boundary marker; and |
||||
Inspection - |
||||
Annual. |
||||
Historic Fill |
Play Areas |
Restricted |
Option #1. Barrier |
Same |
and/or all other |
- Other |
Use |
- Vegetative cover |
engineering |
discharged |
Unpaved |
with a minimum of one |
control |
|
contaminants not |
Playing |
foot clean fill; |
requirement as |
|
otherwise |
Surfaces (for |
Buffer - Minimum |
Schools, Child |
|
excluded in |
example, |
of one foot clean |
Care Centers |
|
N.J.A.C. |
athletic |
fill; Demarcation |
and Type II |
|
7:26E-5.3 |
fields) |
- Geotextile fabric; |
Residential |
|
and Inspection - |
||||
Annual. Option #2. |
||||
Barrier - |
||||
Vegetative cover with |
||||
a minimum of two feet |
||||
clean fill; Buffer |
||||
- Minimum of two feet |
||||
clean fill; |
||||
Demarcation - |
||||
Visible contamination |
||||
boundary marker; and |
||||
Inspection - |
||||
Annual. |
||||
Historic Fill |
Concrete |
Restricted |
Barrier - |
Same |
and/or all other |
or Asphalt |
Use |
Minimum of four |
engineering |
discharged |
Surfaces (for |
inches of concrete or |
control |
|
contaminants not |
example, |
asphalt; Buffer |
requirement as |
|
otherwise |
Driveways, |
- Minimum of four |
Schools, Child |
|
excluded in |
Roadways, |
inches of sub base; |
Care Centers |
|
N.J.A.C. |
Parking, |
Demarcation - |
and Type II |
|
7:26E-5.3 |
Walkways, |
Visible contamination |
Residential |
|
Bicycle |
boundary marker; and |
|||
Paths, etc.) |
Inspection - |
|||
Annual. |
||||
Historic Fill |
Building |
Restricted |
Option #1. Barrier |
Same |
and/or all other |
Footprint -- |
Use |
-- Minimum of four |
engineering |
discharged |
New |
inches of concrete; |
control |
|
contaminants not |
Construction |
Buffer -- |
requirement as |
|
otherwise |
Minimum four inches |
Schools, Child |
||
excluded in |
of sub base; |
Care Centers |
||
N.J.A.C. |
Demarcation -- |
and Type II |
||
7:26E-5.3 |
Visible contamination |
Residential |
||
boundary marker; and |
||||
Inspection -- |
||||
Annual Option #2 |
||||
(for crawl spaces). |
||||
Barrier -- |
||||
Minimum of one foot |
||||
clean fill; Buffer |
||||
-- Minimum of one |
||||
foot clean fill; |
||||
Demarcation -- |
||||
Visible contamination |
||||
boundary marker; and |
||||
Inspection -- |
||||
Semi-annual. |
||||
Historic Fill |
Building |
Restricted |
Option #1. Barrier |
Same |
and/or all other |
Footprint - |
Use |
- Minimum of four |
engineering |
discharged |
Existing |
inches of concrete; |
control |
|
contaminants not |
Construction |
Buffer - Minimum |
requirement as |
|
otherwise |
four inches of sub |
Schools, Child |
||
excluded in |
base; Demarcation |
Care Centers |
||
N.J.A.C. |
- Not required; and |
and Type II |
||
7:26E-5.3 |
Inspection - |
IResidential |
||
Annual. Option #2 |
||||
(for crawl spaces and |
||||
basements with a dirt |
||||
floor). Barrier |
||||
- Minimum of one foot |
||||
clean fill; Buffer |
||||
- Minimum of one foot |
||||
clean fill; |
||||
Demarcation - |
||||
Visible contamination |
||||
boundary marker; and |
||||
Inspection - |
||||
Semi-annual. |
||||
Historic Fill |
Vegetative |
Restricted |
Barrier - |
Option #1. |
and/or all other |
Cover (for |
Use |
Vegetative cover with |
Barrier |
discharged |
example, Lawn |
a minimum of six |
- Vegetative |
|
contaminants not |
Areas) |
inches of clean fill; |
cover with a |
|
otherwise |
Buffer - Minimum |
minimum of one |
||
excluded in |
of six inches of |
foot clean |
||
N.J.A.C. |
clean fill; |
fill; Buffer |
||
7:26E-5.3 |
Demarcation - |
- Minimum of |
||
Visible contamination |
one foot clean |
|||
boundary marker; and |
fill; |
|||
Inspection - |
Demarcation |
|||
Semi-annual. |
- Geotextile |
|||
fabric; and |
||||
Inspection |
||||
- Quarterly. |
||||
Option #2. |
||||
Barrier - |
||||
Vegetative |
||||
cover with a |
||||
minimum of two |
||||
feet clean |
||||
fill; Buffer |
||||
- Minimum of |
||||
two feet clean |
||||
fill; |
||||
Demarcation |
||||
- Visible |
||||
contamination |
||||
boundary |
||||
marker or |
||||
geotextile |
||||
fabric; and |
||||
Inspection |
||||
- Semi-annual. |
||||
Historic Fill |
Landscaped |
Restricted |
Option #1. Barrier |
Same |
and/or all other |
Areas |
Use |
- Minimum of one foot |
engineering |
discharged |
clean fill; *Buffer |
control |
||
contaminants not |
- Minimum of one foot |
requirement as |
||
otherwise |
clean fill;* |
Schools, Child |
||
excluded in |
Demarcation - |
Care Centers |
||
N.J.A.C. |
Geotextile fabric; |
and Type II |
||
7:26E-5.3 |
and Inspection - |
|Residential |
||
Semi-annual. Option |
||||
#2. Barrier - |
||||
Minimum of two feet |
||||
of clean fill; *Buffer |
||||
- Minimum of two feet |
||||
clean fill;* |
||||
Demarcation - |
||||
Visible contamination |
||||
boundary marker; and |
||||
Inspection - |
||||
Semi-annual.* |
||||
Trees and shrubs can |
||||
be planted within |
||||
barrier and/or buffer |
||||
layer(s), but must |
||||
maintain a minimum of |
||||
one foot clean fill |
||||
on all sides and |
||||
below the extent of |
||||
planted root ball of |
||||
larger plant |
||||
materials. |
||||
Historic Fill |
Maintenance |
Restricted |
Barrier - |
Not |
and/or all other |
Areas/Dumpsters |
Use |
Minimum of four |
Applicable. |
discharged |
and Compactor |
inches of concrete or |
||
contaminants not |
Pad/Other |
asphalt; Buffer |
||
otherwise |
Areas |
- Minimum of four |
||
excluded in |
Restricted to |
inches of sub base; |
||
N.J.A.C. |
Workers |
Demarcation - |
||
7:26E-5.3 |
Visible contamination |
|||
boundary marker; and |
||||
Inspection - |
||||
Annual. |
||||
Historic Fill |
Underground |
Restricted |
Piping & Conduits |
Same |
and/or all other |
Utility |
Use |
Placed in Trenches: |
engineering |
discharged |
Corridors |
Barrier - Clean |
control |
|
contaminants not |
fill from surface |
requirement as |
||
otherwise |
down to utility |
Schools, Child |
||
excluded in |
(minimum of one |
Care Centers |
||
N.J.A.C. |
foot); Buffer - |
and Type II |
||
7:26E-5.3 |
Minimum of one foot |
Residential |
||
of clean fill below |
||||
and around the sides |
||||
of the utility; |
||||
Demarcation - |
||||
Visible contamination |
||||
boundary marker along |
||||
the bottom and sides |
||||
of the trench; and |
||||
Inspection - |
||||
Annual. Burial |
||||
Cable may be |
||||
installed within |
||||
barrier and/or buffer |
||||
layer(s) but a |
||||
minimum of one foot |
||||
clean fill must be |
||||
maintained on sides |
||||
and below |
||||
installation. |
||||
Historic Fill |
Contamination |
Restricted |
Barrier - |
Same |
and/or all other |
at depths |
Use |
Minimum of five feet |
engineering |
discharged |
greater than |
clean material; Buffer |
control |
|
contaminants not |
10 feet with |
- Minimum of five |
requirement as |
|
otherwise |
10 feet of |
feet clean material; |
Schools, Child |
|
excluded in |
clean |
Demarcation - |
Care Centers |
|
N.J.A.C. |
material |
None Required; and |
and Type II |
|
7:26E-5.3 |
covering the |
Inspection - |
Residential |
|
contamination |
Annual. |
|||
Widespread |
Any Use |
Unrestricted |
Remove and/or |
Remove |
PCBs |
Use or |
treat all PCB |
and/or treat |
|
Restricted |
contamination to a |
to |
||
Use |
minimum of 10 mg/kg. |
unrestricted |
||
For any PCB |
levels |
|||
contamination greater |
pursuant to |
|||
than 0.2 mg/kg and |
N.J.A.C. |
|||
less than or equal to |
7:26E-5.3(b)2 |
|||
10 mg/kg apply Option |
||||
# 1 or Option # 2: |
||||
Option #1. Barrier |
||||
- Minimum of six |
||||
inches asphalt or |
||||
concrete; Buffer |
||||
- Minimum of 18 |
||||
inches clean fill; |
||||
Demarcation - |
||||
Visible contamination |
||||
boundary marker; and |
||||
Inspection - |
||||
Annual. Option #2. |
||||
Barrier - |
||||
Minimum of 18 inches |
||||
of clean fill; Buffer |
||||
- Minimum of 10 |
||||
inches of compacted |
||||
soil pursuant to 40 |
||||
CFR 761.61(a)7; |
||||
Demarcation - |
||||
Geotextile fabric; |
||||
and Inspection - |
||||
Semi-annual |