New Jersey Administrative Code
Title 7 - ENVIRONMENTAL PROTECTION
Chapter 26E - TECHNICAL REQUIREMENTS FOR SITE REMEDIATION
Subchapter 1 - GENERAL INFORMATION
Section 7:26E-1.10 - Control of ongoing sources and implementation of interim remedial measures
Universal Citation: NJ Admin Code 7:26E-1.10
Current through Register Vol. 56, No. 18, September 16, 2024
(a) As a first priority, the person responsible for conducting the remediation shall:
1. Have a continuing responsibility to identify the need for any interim remedial measure necessary to remove, contain, or stabilize a source of contamination to prevent contaminant migration and to protect the public health and safety and the environment; and
2. Include in each remedial phase report a description of each interim remedial measure implemented and each interim remedial measure that is planned.
(b) Whenever LNAPL is measured greater than 0.01 feet in a collection point (for example, sump, monitoring well, surface water, excavation), the person responsible for conducting the remediation shall, within 60 days after LNAPL is discovered:
1. Report the presence of LNAPL to the Department on a form available on the Department's website at www.nj.gov/dep/srp/srra/forms. Information to be supplied by filling out the form includes:
i. Site identification information;
ii. A summary of the information describing the type of LNAPL observed and how the LNAPL was discovered;
iii. The name of the responsible entity and a certification statement; and
iv. The name of the licensed site remediation professional and a certification statement;
2. Initiate LNAPL recovery to the extent practicable, and report the status of the actions taken within this timeframe on a form available on the Department's website at www.nj.gov/dep/srp/srra/forms. Information to be supplied by filling out the form includes:
i. Site identification information;
ii. A summary of the information describing the type of LNAPL observed, how the LNAPL was discovered, and initial recovery efforts;
iii. The name of the responsible entity and a certification statement; and
iv. The name of the licensed site remediation professional and a certification statement.
(c) Within one year after LNAPL is discovered pursuant to (b) above, the person responsible for conducting the remediation shall:
1. Complete the delineation of the LNAPL;
2. Initiate implementation of an LNAPL interim remedial measure to prevent LNAPL migration, reduce LNAPL contaminant mass to the extent practicable and initiate monitoring of the interim remedial measure; and
3. Document the actions taken pursuant to this section and submit to the Department an LNAPL interim remedial measure report with a form available on the Department's website at ) .
Disclaimer: These regulations may not be the most recent version. New Jersey may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.