New Jersey Administrative Code
Title 7 - ENVIRONMENTAL PROTECTION
Chapter 14A - NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM
Subchapter 22 - TREATMENT WORKS APPROVALS, SEWER BANS, SEWER BAN EXEMPTIONS
Section 7:14A-22.3 - Activities for which a treatment works approval is required
Universal Citation: NJ Admin Code 7:14A-22.3
Current through Register Vol. 56, No. 18, September 16, 2024
(a) Except as provided in N.J.A.C. 7:14A-22.4, no person shall engage in any of the following activities except in conformance with a valid treatment works approval from the Department:
1. Building, installing, modifying, or
operating any treatment works including, but not limited to, sewer extensions, sewer
interceptors, domestic and industrial wastewater treatment systems, holding tanks,
equalization tanks and wastewater treatment and recycling systems.
2. Building, installing, modifying or operating
any sewer line, pumping station or force main which serves more than two buildings
or will convey 8,000 gallons per day or more of flow to a treatment works.
i. Increasing the projected flow in an existing
sewer line by 8,000 gallons per day or more shall require a treatment works approval
permit, irrespective or whether or not additional sewer line construction is
involved;
3. Building,
installing, operating or modifying any residuals treatment units, including, but not
limited to, facilities for composting, heat drying, thickening, digestion, air
drying, thermal reduction, dewatering and storage of sludge;
4. Building, installing, operating or modifying
any domestic or industrial treatment works that discharges directly to the surface
water or groundwater of the State;
5.
Building, installing, operating or modifying any individual subsurface sewage
disposal system if required pursuant to
N.J.A.C.
7:9A-3.9;
6. Building, installing, operating or modifying
any industrial treatment works located in any area of the State where the Department
is the control authority (non-delegated area) for an industrial pre-treatment
program pursuant to 40 CFR 403 and N.J.A.C. 7:14A-19; or
7. Building, installing, operating or modifying
any process unit, storage unit or conveyance facilities that treat and/or convey
RWBR. Projects utilizing RWBR shall be authorized under a NJPDES discharge
permit.
(b) Industrial treatment works approval applications submitted pursuant to (a)4 and 5 above will generally be processed within 30 days of receipt of a complete application in accordance with N.J.A.C. 7:14A-22.6.
(c) Projects for which flow is the determining factor for the requirement of a treatment works approval pursuant to this section, the projected flow criteria specified in N.J.A.C. 7:14A-23.3 shall be used.
Disclaimer: These regulations may not be the most recent version. New Jersey may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.