Section 7:14-2.5 - Field layout (baseline and monuments)
Universal Citation: NJ Admin Code 7:14-2.5
Current through Register Vol. 56, No. 18, September 16, 2024
The owner shall be responsible to establish and confirm field controls prior to start of construction. The contractor shall not be liable to check the accuracy of field controls (baseline and monuments) for sewer pipe installation. However, the contractor's layout must be based on a minimum of two field control points. Whenever the contractor detects an error in the field controls during pipe installation, the contractor shall immediately notify the owner and the owner's engineer of such error with sufficient documentation. The contractor shall be held responsible for all corrective measures and associated costs for failure to notify the owner of such error.
Disclaimer: These regulations may not be the most recent version. New Jersey may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.