(a) Each EDC with one or more customer-generators connected to its distribution system shall submit two interconnection reports per year, one covering January 1 through June 30 and one covering July 1 through December 31. The EDC shall submit the reports by August 1 and February 1, respectively.
(b) The EDC shall submit the reports required by this section electronically, in PDF format, to oce@bpu.state.nj.us. In addition, the EDC may, at its discretion, submit a paper copy of the reports by hand delivery or regular mail to the Secretary, Board of Public Utilities, 44 South Clinton Avenue, 9th Floor, PO Box 350, Trenton, New Jersey 08625-0350. The EDC may, at its discretion, submit the interconnection report together with the net metering report required under 14:8-4.5.
(c) Each report shall contain the following information regarding customer-generator facilities that interconnected with the EDC's distribution system for the first time during the reporting period, listed by type of renewable energy technology:
(d) The information required under (c) above shall be listed by type of class I renewable energy, as set forth at 14:8-2.5(b), as follows: