(a) Applicants for a certificate of approval for an additional cable television franchise shall submit verifiable cost estimates of projected aerial utility and cable television plant rearrangement needed (make-ready work) to permit the attachment of the proposed cable television system.
(b) The estimates shall be compiled by one of the following methods:
(c) Any survey shall be submitted in a form permitting verification by the pole owning utility, the Office or an independent party with experience in conducting utility make-ready surveys. All surveys shall contain the underlying facts and assumptions determining the cost estimate and a description of the process for conducting the survey.