Chapter Saf-C 3300 - RULES FOR MODULAR BUILDINGS AND BUILDING COMPONENTS
Part Saf-C 3310 - POST CERTIFICATION MODIFICATION AND RELOCATION
Section Saf-C 3310.03 - Destructive Disassembly

Universal Citation: NH Admin Rules Saf-C 3310.03

Current through Register No. 40, October 3, 2024

(a) Destructive disassembly of certified modular buildings and building components shall not be performed in order to conduct tests or inspections, with the exception of post certification modification as specified by Saf-C 3310.01(a).

(b) Standards or test criteria, different from those adopted by the department, shall not be imposed.

(c) The responsibility for destructive disassembly and repairs shall be determined by the department on a case-by-case basis and as deemed necessary to assure compliance with this chapter.

#5439, eff 7-24-92; ss by #5935, eff 12-20-94; ss by #6885, eff 11-18-98; ss by #8741, INTERIM, eff 11-18-06, EXPIRED: 5-17-07

New. #9752, eff 7-9-10 (from Saf-C 3311.03)

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.