New Hampshire Code of Administrative Rules
Saf - Department of Safety
Subtitle Saf-C - Commissioner, Department of Safety
Chapter Saf-C 3300 - RULES FOR MODULAR BUILDINGS AND BUILDING COMPONENTS
Part Saf-C 3306 - MANUFACTURER BUILDING SYSTEMS FOR AGENCY REVIEW AND APPROVAL
Section Saf-C 3306.02 - Required Documents
Current through Register No. 40, October 3, 2024
(a) All documents submitted with the application shall be identified to indicate the manufacturer's name, location of the approved state label(s), and the location of the manufacturer's data plate.
(b) Structural connections and connection of systems, equipment and appliances to be performed on-site shall be identified, detailed, and distinguished from work to be performed in the manufacturing facility.
(c) The method of interconnection between modular buildings and building components and location of connections shall be identified.
(d) Design calculations and test reports shall be submitted with the application.
(e) Drawings shall be dated and identified. An index shall be included which shall be used to determine that the package is complete.
(f) Documents shall include the following:
(g) All documents hall have a seal from a New Hampshire licensed architect when required by RSA 310-A:52, and a seal from a New Hampshire licensed professional engineer when an architect's seal is required.
#5439, eff 7-24-92; ss by #6810, INTERIM, eff 7-25-98, EXPIRES: 11-22-98; ss by #6885, eff 11-18-98;ss by #8741, INTERIM, eff 11-18-06, EXPIRED: 5-17-07
New. #9752, eff 7-9-10