New Hampshire Code of Administrative Rules
Puc - Public Utilities Commission
Chapter Puc 800 - UNDERGROUND UTILITY DAMAGE PREVENTION PROGRAM
Part Puc 804 - DUTIES OF OPERATORS
Section Puc 804.02 - Notification Requirements
Current through Register No. 12, March 21, 2024
(a) Any operator who owns, operates, or both, an underground facility used in the transportation of gas or hazardous liquids and subject to the federal pipeline statute, 49 U.S.C. 60101 to 60137, shall:
(b) An affected operator shall complete the notification required by Puc 804.02(a)(2) above by:
(c) An affected operator shall complete the notification required by Puc 804.02(a)(3) above by distributing informational mailings, conducting informational sessions, or other means of effective communication.
(d) An operator who participates in an underground utility damage prevention system shall not be required to locate underground facilities not owned by the operator, including, but not limited to, any such underground facilities running from a house to a garage or other outbuilding.
(e) When no underground facility is within the area of a proposed excavation, an owner or operator receiving notification of the proposed excavation shall so advise the excavator by:
#2050, eff 6-13-82; ss by #2912, eff 11-26-84, EXPIRED: 11-26-90
New. #5616, eff 4-20-93, EXPIRED: 4-20-99
New. #7259, INTERIM, eff 5-2-00, EXPIRES: 8-30-00; ss by #7350, eff 8-23-00; ss by #7900, eff 5-29-03; ss by #9318, eff 11-8-08