New Hampshire Code of Administrative Rules
Pes - Pesticide Control Board
Chapter Pes 100 - ORGANIZATION RULES
Part Pes 101 - DEFINITIONS
Section Pes 101.28 - Reference line

Universal Citation: NH Admin Rules Pes 101.28

Current through Register No. 40, October 3, 2024

"Reference line" means "reference line" as defined in RSA 483-B:4, namely:

(a) For natural fresh water bodies without artificial impoundments, the natural mean high water level as determined by the department of environmental services, or in the absence of determination by the department of environmental services, the high water mark;

(b) For artificially impounded fresh water bodies with established flowage rights, the limit of the flowage rights, and for water bodies without established flowage rights, the waterline at full pond as determined by the elevation of the spillway crest;

(c) For coastal waters, the highest observable tide line, which means a line defining the furthest landward limit of tidal flow, not including storm events, which can be recognized by indicators such as the presence of a strand line of flotsam and debris, the landward margin of salt tolerant vegetation, or a physical barrier that blocks further flow of the tide; and

(d) For rivers, the ordinary high water mark.

#150, eff 1-9-74; ss by #2209, eff 12-13-82; ss by #2781, eff 7-26-84; ss by #4867, eff 7-19-90; ss by #6239, eff 5-2-96; ss by #7544, eff 8-9-01

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.