New Hampshire Code of Administrative Rules
Lab - Commissioner, Department of Labor
Chapter Lab 1400 - SAFETY AND HEALTH OF EMPLOYEES
Part Lab 1403 - RULES FOR EMPLOYEE SAFETY AND HEALTH
Section Lab 1403.13 - Concrete, Concrete Forms, and Shoring

Universal Citation: NH Admin Rules Lab 1403.13

Current through Register No. 12, March 21, 2024

The employer shall ensure compliance with the following requirements:

(a) Employees shall not work above vertically protruding reinforcing steel, unless it has been protected to eliminate the hazard of impalement;

(b) Powered and rotating-type concrete troweling machines that are manually guided shall be equipped with a deadman-type operating control; and

(c) Formwork and shoring shall safely support all loads imposed during concrete placement. Drawings or plans of jack layout, formwork, shoring, working decks, and scaffolding systems shall be available at the jobsite.

#4118 eff 8-22-86, EXPIRED: 8-22-92

New. #6684, eff 2-4-98, EXPIRED: 2-4-06

New. #8606, INTERIM, eff 4-12-06, EXPIRED 10-09-06 (formerly Lab 1403.14 )

New. #8796, eff 1-11-07

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.