New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wt - Wetlands Programs
Chapter Env-Wt 600 - COASTAL LANDS AND TIDAL WATERS/WETLANDS
Part Env-Wt 606 - OVERWATER STRUCTURES IN COASTAL AREAS
Section Env-Wt 606.04 - Plan Requirements for All Overwater Structures

Universal Citation: NH Admin Rules Env-Wt 606.04

Current through Register No. 13, March 27, 2025

In addition to the approval criteria in Env-Wt 313.01, CFA requirements in Env-Wt 603.04, vulnerability assessment requirements in Env-Wt603.05, and general plan requirements in Env-Wt 311.05 and Env-Wt 603.05, plans submitted with an application for an overwater structure shall include the following:

(a) A plan view, depicting the following:

(1) The location of the landward boundary of the FNP or, if no FNP is present, the landward boundary of the navigational channel;

(2) The location and dimensions of all existing shoreline structures on the subject property;

(3) The location and dimensions of all proposed structures; and

(4) For commercial tidal docks, public docks, and industrial tidal docks, certification by a professional engineer that the dock has been designed for its intended use;

(b) An elevational view, depicting the following:

(1) The location and dimensions of all proposed structures, including permanent piers, pilings, float stop structures, ramps, floats, and dolphins; and

(2) The location of the landward boundary of the FNP or, if no FNP is present, the landward boundary of the navigational channel;

(c) For dock maintenance projects that are classified as minimum impact under Env-Wt 606.17, the applicant shall provide the following information as part of the application:

(1) Application certifications in Env-Wt 311.11;

(2) A plan showing the location and dimensions of all existing structures;

(3) An identification of those pilings and structures to be repaired or replaced; and

(4) Photographs showing the repair project from:
a. The docking structures looking waterward; and

b. The end of the dock looking towards the shoreland attachment; and

(d) For minor impact dock maintenance projects under Env-Wt 606.04(c), the applicant shall provide the following information as part of the standard application:

(1) Application certifications in Env-Wt 311.11;

(2) Plans and photographs as described in (c) above; and

(3) A coastal functional assessment pursuant to Env-Wt 603.04.

#2923, eff 12-10-84, EXPIRED: 12-10-90

New.#5028, eff 12-20-90; rpld and moved by #5740, eff <br> 11-23-93 (see Env-Wt 403.03)

New.#8341, eff 4-25-05 (from Env-Wt 606.06) (See second Revision Note at chapter heading of Env-Wt 600)

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.