New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wt - Wetlands Programs
Chapter Env-Wt 500 - PROJECT-SPECIFIC REQUIREMENTS
Part Env-Wt 522 - AGRICULTURAL ACTIVITIES
Section Env-Wt 522.03 - Application Requirements for Agricultural Projects

Universal Citation: NH Admin Rules Env-Wt 522.03

Current through Register No. 13, March 27, 2025

The project-specific information required by Env-Wt 310.01(c)(1) or Env-Wt 311.03(b)(11), as applicable, for an agricultural project shall be as follows:

(a) A conservation plan prepared by NRCS, a county conservation district or a plan of conservation practices for proposed wetland impacts prepared by a certified wetland scientist;

(b) Aerial photography with site impact located;

(c) NRCS soil survey reports for the project area;

(d) A wetland delineation and impact plan prepared by an NRCS soil scientist or certified wetland scientist;

(e) A sediment and erosion control plan;

(f) A construction sequence detailing timing of the work proposed, including dewatering plans, construction of access routes, and temporary impacts; and

(g) All of the information and documentation specified in Env-Wt 522.06(a).

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.