Current through Register No. 13, March 27, 2025

In addition to the design and construction requirements in Env-Wt 300, the following requirements shall apply to utility projects:

(a) The project shall be designed:

(1) To avoid and minimize construction access over, or work in or upon, organic soils; and

(2) In accordance with Env-Wt 313.03;

(b) Construction access or work shall be prohibited in PRAs unless the work:

(1) Is authorized as an SPN or a project type exception under Env-Wt 407; or

(2) Causes only temporary impacts;

(c) All project activities shall be performed, located, constructed, and maintained in accordance with the Utility BMPs;

(d) No project shall cause permanent filling of wetlands in excess of 10,000 SF unless mitigation is provided in accordance with Env-Wt 800; and

(e) Swamp mats shall be:

(1) Used in any area necessary to provide access:

(2) Removed as soon as the work is completed; and

(3) In no case left in place longer than one growing season.

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.