New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wt - Wetlands Programs
Chapter Env-Wt 500 - PROJECT-SPECIFIC REQUIREMENTS
Part Env-Wt 519 - PONDS
Section Env-Wt 519.08 - Classification of Pond Construction Projects
Universal Citation: NH Admin Rules Env-Wt 519.08
Current through Register No. 13, March 27, 2025
A project to construct a pond shall be classified as follows:
(a) Subject to (b), below, the project shall be a minimum impact project if the following criteria are met:
(1) The proposed project will impact less
than 3,000 SF of wetlands, except that a fire pond may impact up to 10,000 SF
of wetlands;
(2) The project area
contains no very poorly drained soils;
(3) No waivers to any design
requirements;
(4) The proposed pond
will not be fed by or cause outflow to any watercourse; and
(5) The project is not located in and will
not impact a PRA, except as provided in Env-Wt 407;
(b) A new wildlife pond shall be considered a minimum impact project if the following criteria are met:
(1) The applicant meets with the technical
reviewer in the department's wetlands bureau at least 7 days prior to
submitting the application;
(2) The
pond is designed by a certified wetland scientist;
(3) The pond meets all design requirements
specified in Env-Wt 519.05; and
(4) The project's total wetland impact does
not exceed 20,000 SF;
(c) The project shall be a minor impact project if any of the criteria in (a) or (b), above, as applicable, are not met or if all of the following criteria are met:
(1) The project area contains very poorly
drained soils but does not contain more than 15% inclusions of very poorly
drained soils;
(2) The proposed
pond will not be fed by or cause outflow to any watercourses;
(3) The project is not located in a marsh or
scrub-shrub wetland adjacent to a surface water;
(4) The project will not impact a PRA, except
as provided in Env-Wt 407; and
(5)
The project will impact 3,000 SF or greater but less than 10,000 SF of
wetlands; and
(d) The project shall be a major impact project if the proposed project:
(1) Will impact 10,000 SF or more of wetlands
or surface waters; or
(2) Does not
meet the criteria to be a minimum impact or minor impact project.
Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.