New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wt - Wetlands Programs
Chapter Env-Wt 500 - PROJECT-SPECIFIC REQUIREMENTS
Part Env-Wt 513 - DOCKING STRUCTURES AND ACCESSORY DOCKING STRUCTURES
Section Env-Wt 513.15 - Design Requirements for Permanent Docking Structures
Current through Register No. 13, March 27, 2025
(a) In addition to meeting the applicable design requirements of Env-Wt 300, all permanent docking structures and all accessory docking structures shall be designed to meet the requirements in this part relative to setbacks, navigation space, dimensions, and frontage, and the requirements of this section.
(b) The standard design for a permanent docking structure shall be open pile construction.
(c) Pile bents shall be spaced at least 12 feet apart, as measured from the center of each pile bent.
(d) The department shall approve a design other than open pile construction only if the applicant demonstrates that:
(e) The demonstration that pilings cannot be driven shall:
(f) If an applicant demonstrates that pilings cannot be driven, an alternate design may be submitted.
(g) If the alternate design is a crib dock, the crib shall be designed in accordance with the following:
(h) If the alternate design is other than a crib dock, such as caissons, concrete supports, or prefabricated cofferdams, the docking structure shall be designed in accordance with standard engineering practices for the design proposed.