New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wt - Wetlands Programs
Chapter Env-Wt 300 - PERMITS AND OTHER AUTHORIZATIONS; CONDITIONS APPLICABLE TO ALL WORK IN JURISDICTIONAL AREAS
Part Env-Wt 307 - CONDITIONS APPLICABLE TO ALL ACTIVITIES IN JURISDICTIONAL AREAS
Section Env-Wt 307.11 - Filling Activity Conditions

Universal Citation: NH Admin Rules Env-Wt 307.11

Current through Register No. 13, March 27, 2025

In addition to all other applicable conditions in this part, the following conditions shall apply to all temporary and permanent filling activities:

(a) Fill shall be clean sand, gravel, rock, or other material that:

(1) Meets the project's specifications for its use; and

(2) Does not contain any material that could contaminate surface or groundwater or otherwise adversely affect the ecosystem in which it is used;

(b) Limits of fill shall be clearly identified prior to commencement of work and controlled in accordance with Env-Wt 307.03 to ensure that fill does not spill over or erode into any area where filling is not authorized;

(c) Slopes shall be immediately stabilized by a method specified in Env-Wq 1506 or Env-Wq 1508, as applicable, to prevent erosion into adjacent wetlands or surface waters;

(d) No fill shall be allowed to achieve setbacks to septic systems specified in Env-Wq 1000;

(e) Fill shall be not placed so as to direct flows onto adjacent or down-current property;

(f) Swamp mats and construction mats shall be deemed temporary fill for new authorizations only if they meet the requirements of (h)(1) and (h)(2), below;

(g) Authorized temporary fill other than swamp mats, construction mats, and corduroy shall be placed on geotextile fabric laid on preconstruction wetland grade;

(h) Subject to (i), below, temporary fill shall be:

(1) In place no longer than one growing season;

(2) Removed immediately upon work completion; and

(3) Disposed of at an upland location in a manner that prevents its erosion into a surface water or wetland;

(i) Corduroy shall be deemed temporary fill that may be left in place if it:

(1) Is installed as part of a skid trail in accordance with the Forestry BMPs;

(2) Does not exceed 1,000 LF and 20,000 SF per crossing; and

(3) Does not cross or otherwise impact a perennial stream, marsh, PRA, or vernal pool;

(j) Wetlands and surface waters shall be restored to pre-impact conditions and elevation as specified in Env-Wt 307.12(i), below, unless otherwise authorizedin an issued permit;

(k) Swamp mats shall be:

(1) Properly installed, not dragged into position; and

(2) Removed immediately upon the completion of work; and

(l) No fill shall take place in a PRA unless:

(1) Specifically authorized by the department in an issued permit; or

(2) Authorized under applicable project-specific provisions.

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.