New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Ws - Division of Water
Chapter Env-Ws 300 - NEW HAMPSHIRE DRINKING WATER RULES
Part Env-Ws 373 - DESIGN STANDARDS FOR NON-COMMUNITY WATER SYSTEMS
Section Env-Ws 373.27 - Final Inspection
Universal Citation: NH Admin Rules Env-Ws 373.27
Current through Register No. 13, March 27, 2025
(a) Upon completion of the construction of a non-community water system, but before any service is offered, the department shall conduct a sanitary survey, or inspection, of the water system. This inspection shall be performed within 5 working days after notification by the owner of the proposed water system that construction, including all required testing, is complete. The water system shall not be approved for any service unless this inspection is completed.
(b) The proposed operator for a new NTNCwater system shall:
(1) Have taken or arranged to
take the operator certification exam as required under Env-Ws 367;
and
(2) Be in attendance at the
inspection required under (a), above .
(See Revision Note at chapter heading for Env-Ws 300); ss by #8499, eff 11-30-05
Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.