New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wq - Water Quality and Quantity Programs
Chapter Env-Wq 1500 - ALTERATION OF TERRAIN
Part Env-Wq 1511 - ADDITIONAL REQUIREMENTS FOR SOLAR ARRAYS
- Section Env-Wq 1511.01 - Applicability
- Section Env-Wq 1511.02 - Calculation of the Area of Disturbance
- Section Env-Wq 1511.03 - Calculation of Water Quality Volume for Solar Arrays
- Section Env-Wq 1511.04 - Slope Plan
- Section Env-Wq 1511.05 - Conditions for Sheet Flow
- Section Env-Wq 1511.06 - Calculations for Stormwater Drainage
- Section Env-Wq 1511.07 - Stable Channel Calculations and Design, Benching
- Section Env-Wq 1511.08 - Additional Requirements for Sediment Control Methods
- Section Env-Wq 1511.09 - Plan Requirements for Sediment and Erosion Control Practices
- Section Env-Wq 1511.10 - Additional Erosion Control Notes for Solar Array Fields
- Section Env-Wq 1511.11 - Long-Term Maintenance for Solar Arrays
- Section Env-Wq 1511.12 - Proximity to Natural Resources
Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.