New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wq - Water Quality and Quantity Programs
Chapter Env-Wq 1500 - ALTERATION OF TERRAIN
Part Env-Wq 1506 - METHODS FOR EROSION AND SEDIMENT CONTROL DURING TERRAIN ALTERATION ACTIVITIES
Section Env-Wq 1506.11 - Sediment Control Methods: Construction Dewatering

Universal Citation: NH Admin Rules Env-Wq 1506.11

Current through Register No. 13, March 27, 2025

Dewatering shall comply with the following:

(a) The discharge shall be stopped immediately if the receiving area shows any sign of instability or erosion;

(b) All channels, swales, and ditches dug for discharging water from the excavated area shall be stable prior to directing discharge to them;

(c) If a construction equipment bucket is used, it shall empty the material to a stable area;

(d) No dewatering shall occur during periods of intense, heavy rain;

(e) Flow to the sediment removal structure shall not exceed the structure's capacity to settle and filter flow or its volume capacity; and

(f) Wherever possible, the discharge from the sediment removal structure shall drain to a well-vegetated buffer by sheet flow while maximizing the distance to the nearest water resource and minimizing the slope of the buffer area.

(See Revision Note #1 at chapter heading for Env-Wq 1500) #9343, eff 1-1-09

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.