New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wq - Water Quality and Quantity Programs
Chapter Env-Wq 1000 - SUBDIVISIONS; INDIVIDUAL SEWAGE DISPOSAL SYSTEMS
Part Env-Wq 1019 - PRESSURE DISTRIBUTION
Section Env-Wq 1019.04 - Application Requirements
Universal Citation: NH Admin Rules Env-Wq 1019.04
Current through Register No. 13, March 27, 2025
The following shall appear on or with all plans and specifications for pressure distribution systems submitted for review:
(a) All calculations as indicated on a pressure distribution worksheet, revised 4/96, found at http://des.nh.gov/organization/commissioner/pip/forms/ssb/documents/ssb_pd_worksheet.doc;
(b) All details for network layout;
(c) Pump/pump station or siphon details;
(d) Network drainage to avoid freezing potential;
(e) All construction methods for basal area preparation; and
(f) Inspection/construction requirements as follows:
(1) "Basal area preparation to be
inspected by system designer prior to fill placement. An inspection report
shall be submitted to the regional inspector at the time of final
inspection.";
(2) "Caution to be
exercised during fill placement/site preparation to avoid compaction or
smearing of infiltrative surface."; and
(3) "Maintain 8-12 inches of fill between
equipment tracks and prepared surface."
(See Revision Note at chapter heading for Env-Wq 1000) #9086, eff 2-9-08
Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.