New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wq - Water Quality and Quantity Programs
Chapter Env-Wq 1000 - SUBDIVISIONS; INDIVIDUAL SEWAGE DISPOSAL SYSTEMS
Part Env-Wq 1018 - BEDS AND TRENCHES
Section Env-Wq 1018.01 - Construction of Beds
Universal Citation: NH Admin Rules Env-Wq 1018.01
Current through Register No. 13, March 27, 2025
(a) Concrete chamber beds shall be as specified in Env-Wq 1017.02(a).
(b) For a conventional stone-and-pipe system, the following shall apply:
(1) The bed shall consist of a minimum of 12
inches of stone total, with a minimum of 6 inches of stone under the pipes and
a minimum of 2 inches of stone over the pipes; and
(2) The pipes shall be laid evenly spaced a
maximum of 5 feet on center with 2.5 feet of septic stone from the pipes to the
outside of the bed.
(c) The bed for a chamber or LDGP system shall be as specified in the most recent manufacturer's design manual approved by the department.
(See Revision Note at chapter heading for Env-Wq 1000) #9086, eff 2-9-08
Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.