New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Wq - Water Quality and Quantity Programs
Chapter Env-Wq 1000 - SUBDIVISIONS; INDIVIDUAL SEWAGE DISPOSAL SYSTEMS
Part Env-Wq 1003 - APPLICATIONS FOR SUBDIVISION OR ISDS APPROVAL
Section Env-Wq 1003.14 - Ledge Lot Specifications

Universal Citation: NH Admin Rules Env-Wq 1003.14

Current through Register No. 13, March 27, 2025

In addition to the requirements for an ISDS application established in Env-Wq 1003.12, the applicant designing an ISDS for a ledge lot shall:

(a) Specify the type of fill to be used to raise the bed to the appropriate height;

(b) Specify the method of stabilization of the fill, including compaction method, layering, wetting, and stabilization period;

(c) Supply test pit information to verify the nature of the receiving layer, both at the EDA and down-slope from the proposed EDA, as specified in Env-Wq 1006.04;

(d) Show on the plan all bedrock exposures within 75 feet of the proposed EDA; and

(e) Show on the plan all surface waters and drinking water supplies within 75 feet of the components of the proposed ISDS.

(See Revision Note at chapter heading for Env-Wq 1000) #9086, eff 2-9-08; ss by #9904-A, eff 4-16-11

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.