New Hampshire Code of Administrative Rules
Env - Department of Environmental Services
Subtitle Env-Hw - Hazardous Waste Programs
Chapter Env-Hw 500 - REQUIREMENTS FOR HAZARDOUS WASTE GENERATORS
Part Env-Hw 510 - MANIFEST REQUIREMENTS
Section Env-Hw 510.05 - Rail or Water Shipments

Universal Citation: NH Admin Rules Env-Hw 510.05

Current through Register No. 13, March 27, 2025

(a) For bulk shipments of hazardous waste that occur solely by water and for rail shipments of hazardous waste that originate at the site of generation, the generator shall comply with this section instead of with Env-Hw 510.02(a)(5), (a) (6), (b)(5), (b)(6), and (c)(3), as applicable.

(b) For bulk shipments of hazardous waste that occur solely by water, if waste is to be shipped using a paper manifest, the generator shall, within 5 days of shipment, send:

(1) To the owner or operator of the designated facility, or to the last water transporter to handle the waste in the United States if exported by water, 3 copies of the dated and signed manifest;

(2) To the department, one copy of the dated and signed manifest; and

(3) To the destination state, one copy of the dated and signed manifest if the shipment remains within the United States and the destination state requires a copy.

(c) For rail shipments of hazardous waste that originate at the site of generation, if waste is to be shipped using a paper manifest, the generator shall, within 5 days of shipment, send:

(1) To the following, 3 copies of the dated and signed manifest:
a. The next non-rail transporter, if any;

b. The designated facility if transported solely by rail; or

c. The last rail transporter to handle the waste in the United States if exported by rail;

(2) To the department, one copy of the dated and signed manifest; and

(3) To the destination state, one copy of the dated and signed manifest if the shipment remains within the United States and the destination state requires a copy.

(d) For bulk shipments of hazardous waste that occur solely by water and for rail shipments of hazardous waste that originate at the site of generation, if waste is to be shipped using an electronic manifest that has been printed for a generator's signature, the generator shall, within 5 days of shipment, send:

(1) To the department, one copy of the dated and signed manifest; and

(2) To the destination state, one copy of the dated and signed manifest if the shipment remains within the United States and the destination state requires a copy.

#5053, eff 1-24-91; ss by #5886, eff 8-26-94; ss by #7333, eff 8-1-00; ss by #9215, INTERIM, eff 8-1-08; (See Revision Note at chapter heading for Env-Hw 500) ss by #9367, eff 1-28-09

Disclaimer: These regulations may not be the most recent version. New Hampshire may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.