Nevada Administrative Code
Chapter 704 - Regulation of Public Utilities Generally
COGENERATION AND SMALL POWER PRODUCTION
Section 704.8787 - Interconnection costs

Universal Citation: NV Admin Code 704.8787

Current through September 16, 2024

1. A qualifying facility must pay for all appropriate interconnection costs with an electric utility.

2. The interconnection costs of a facility which is already interconnected with a utility to sell electric energy are limited to any additional expenses incurred by the utility to permit purchases of electric energy.

3. The interconnection costs of a facility which is not already interconnected with a utility to sell electric energy are limited to the costs related to the interconnection facilities necessary to receive energy or capacity from the qualifying facility into the utility's grid in accordance with the requirements adopted by the utility.

Pub. Service Comm'n, Gen. Order 32 § 6.0, eff. 8-21-81-NAC A 3-27-92-Substituted in revision for NAC 704.725

NRS 703.025, 704.210

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.