Nevada Administrative Code
Chapter 704 - Regulation of Public Utilities Generally
COGENERATION AND SMALL POWER PRODUCTION
Section 704.8785 - Requirements for reporting data: Information relating to design, operations and safety; efficiency of generation of power

Universal Citation: NV Admin Code 704.8785

Current through December 12, 2024

A utility shall file with the Commission, in the format for a tariff, the requirements for:

1. The design, operations and safety related to cogeneration facilities and small power production facilities located within the utility's certificated area in this State; and

2. The total efficiency of the generation of power for each cogeneration facility located within the utility's certificated area in this State.

Pub. Service Comm'n, Gen. Order 32 § 5.0, eff. 8-21-81-NAC A 3-27-92-Substituted in revision for NAC 704.720

NRS 703.025, 704.210

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.