Section 704.8781 - Submission of information

Universal Citation: NV Admin Code 704.8781

Current through September 16, 2024

The owner or operator of a qualifying facility or a facility which may become a qualifying facility shall submit the following information, without limitation, to the utility before negotiations relating to the contract for the purchase of that energy begin:

1. His or her name and address and the location of the facility;

2. A brief description of the facility, including a statement whether it is a small power production facility or a cogeneration facility;

3. The primary source of energy used or to be used by the facility;

4. The capacity of the facility for the production of power;

5. The percentage of ownership which will be held in the facility by any electric utility or any holding company of a public utility;

6. Proof that the owner or operator of the facility controls or will obtain control of the site for the facility;

7. The efficiency of the generation of electricity of the facility; and

8. If the facility is a cogeneration facility, the total efficiency of the generation of electricity and the use of waste energy of the facility.

Pub. Service Comm'n, Gen. Order 32 § 3.4, eff. 8-21-81-NAC A 3-27-92-Substituted in revision for NAC 704.710

NRS 703.025, 704.210

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.