Nevada Administrative Code
Chapter 704 - Regulation of Public Utilities Generally
COGENERATION AND SMALL POWER PRODUCTION
- Section 704.8771 - Small power production facility" defined
- Section 704.8773 - Applicability
- Section 704.8775 - Adoption by reference of certain federal regulations
- Section 704.8777 - Proposed contract for purchase of capacity or energy: Contents; requirement for bond or other security; application for approval of contract
- Section 704.8779 - Proposed contract for purchase of capacity or energy: Consistency with plan to increase supply of or decrease demand for electricity
- Section 704.8781 - Submission of information
- Section 704.8783 - Requirements for reporting data: Short-term avoided costs; analyses and calculations for determining proposed rates
- Section 704.8785 - Requirements for reporting data: Information relating to design, operations and safety; efficiency of generation of power
- Section 704.8787 - Interconnection costs
- Section 704.8789 - System emergency
- Section 704.8791 - Contracts and short-term rates for purchase of power; rates for sales
- Section 704.8793 - Resolution of disputes
Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.