Nevada Administrative Code
Chapter 461A - Mobile Home Parks and Lots
REQUIREMENTS FOR CONSTRUCTION AND ALTERATION
Section 461A.110 - Marking underground utility lines

Universal Citation: NV Admin Code 461A.110

Current through December 12, 2024

1. The underground location of electric cables, gas piping, water piping and sewer lines which are buried along the periphery of a lot or within 4 feet of a mobile home stand must be indicated by underground markers in the form of tapes, electrically connected wires or other means for locating the underground lines. Signs may be erected above ground to assist in locating the lines, but such signs must not be used in lieu of the required system of underground markers.

2. The holder of the permit shall accurately plot the location of all underground utility lines when they are installed. The holder shall keep a copy of this plot for reference at the mobile home park and upon request, make it available to the agency for enforcement.

Added to NAC by Mfd. Housing Div., eff. 6-29-84

NRS 461A.090

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.