Nevada Administrative Code
Chapter 461 - Manufactured Buildings
APPROVAL; FEES
Section 461.100 - Application for approval by Administrator of manufacturer's system of construction and plans
Current through December 12, 2024
1. To obtain the Administrator's approval of a manufacturer's system of construction or plans for a model of factory-built housing, a manufactured building or a modular component, a manufacturer must file an application with the Division or a third-party reviewer.
2. The application must be on a form prescribed by the Division and accompanied by:
3. If the application is for approval of a system of construction for factory-built housing, manufactured buildings or modular components, the application must be accompanied by one copy of a manual for assurance of quality. The manual must include the name of the owner or responsible employee, the name of the inspector who will control quality, the name of the supervisor of production, and a list of the procedures to be used for inspections, tests, control of quality and keeping of records.
4. If the application is for approval of plans for a model of factory-built housing, a manufactured building or a modular component that are reviewed by a third-party reviewer, the plans must bear the stamp of the third-party reviewer as set forth in NAC 461.117. The third-party reviewer may affix his or her stamp electronically.
5. The Administrator or his or her designee may require the submission of specifications, engineering calculations and other data.
6. The Administrator may waive the requirement for submission of plans, specifications, engineering calculations and other data if the Administrator finds that, because of the nature of the proposed work, his or her examination of such detailed material is not necessary to ensure the manufacturer's compliance with this chapter.
[Mfd. Housing Div., Factory-built Housing Reg. §9, eff. 8-6-82]-(NAC A by R192-05, 9-18-2006); A by R110-22A, eff. 12/4/2023
NRS 461.170