Nevada Administrative Code
Chapter 455C - Boilers, Elevators and Pressure Vessels
ELEVATORS
Requirements, Standards and Procedures
Section 455C.528 - Violations: Report to responsible person; action by Mechanical Compliance Section; determination and report of whether violation abated
Current through September 16, 2024
1. If, at the time of an inspection or periodic test of any elevator, the inspector or special inspector determines that a violation of a requirement of NAC 455C.400 to 455C.530, inclusive, and section 1of this regulation, exists, he or she shall provide a written report to the person responsible for the operation of the elevator pursuant to NAC 455C.504. The report must describe the nature of the violation, including a reference to any provision of NAC 455C.400 to 455C.530, inclusive, and section 1 of this regulation, or set forth in a publication adopted by reference in NAC 455C.500 that was violated. The inspector or special inspector shall submit a copy of the report to the office of the Mechanical Compliance Section that maintains records for the elevator within 10 business days after the inspection or periodic test was performed. The Mechanical Compliance Section shall:
2. An inspector or special inspector who submits a report to the Mechanical Compliance Section pursuant to subsection 1 shall:
Added to NAC by Div. of Industrial Relations by R101-02, eff. 12-15-2004; A by R077-14, 1-16-2015; A by R045-20A, eff. 10/26/2020
NRS 455C.110