Nevada Administrative Code
Chapter 455C - Boilers, Elevators and Pressure Vessels
BOILERS AND PRESSURE VESSELS
Boilers
Section 455C.268 - Qualifications of attendant

Universal Citation: NV Admin Code 455C.268

Current through September 16, 2024

A person is qualified to attend a power boiler or a high-pressure, high-temperature water boiler, where such attendance is required pursuant to NAC 455C.274, if the person has:

1. The technical training, experience and knowledge necessary to start, operate and shut down the boiler; and

2. A high school diploma or the equivalent and at least the following number of days or equivalent hours of documented experience in the operation of boilers for the size of the boiler being operated:

(a) For up to 299 boiler horsepower, 182 days.

(b) For 300 to 499, inclusive, boiler horsepower, 365 days.

(c) For 500 to 1,000, inclusive, boiler horsepower, 547 days.

(d) For more than 1,000 boiler horsepower, 1,095 days.

Added to NAC by Div. of Industrial Relations by R101-02, eff. 12-15-2004

NRS 455C.110

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.