Nevada Administrative Code
Chapter 455 - Excavations and Demolitions
EXCAVATION OR DEMOLITION NEAR SUBSURFACE INSTALLATION
Section 455.125 - Duties of operator upon receipt of notification from association for operators

Universal Citation: NV Admin Code 455.125

Current through September 16, 2024

1. An operator locating and identifying subsurface installations pursuant to the provisions of paragraph (a) of subsection 1 of NRS 455.130 shall locate and identify all subsurface installations of the operator that are in use or held for prospective use and are located within the affected area of the proposed excavation or demolition and shall:

(a) Mark the approximate location of the subsurface installations located and identified as required by NRS 455.133 and NAC 455.130 or in another manner agreed to in writing between the excavator and the operator; or

(b) For any subsurface installations of the operator that the operator was unable to identify or locate according to the records of the operator:
(1) Inform the excavator of the approximate location of the subsurface installation; and

(2) Provide to the excavator the best description available of the subsurface installation from those records.

2. If an operator determines that it has no subsurface installations within the affected area of the proposed excavation or demolition, the operator shall notify the excavator pursuant to the provisions of subsection 2 of NRS 455.130 by:

(a) Notifying the excavator directly; or

(b) Making a mark which indicates that the operator has no subsurface installations within the affected area of the proposed excavation or demolition in a manner that:
(1) Is consistent with the practice in the industry; or

(2) Includes the name, initials or logo of the operator.

3. An operator shall:

(a) Immediately notify the association for operators once the duties described in subsections 1 and 2 have been completed; or

(b) If the operator and excavator mutually agree upon a time for the completion of the duties described in paragraph (a) of subsection 1 of NRS 455.130 which is later than 2 working days after the date on which the operator received notice through the association for operators pursuant to paragraph (a) of subsection 1 of NRS 455.110, immediately notify the association for operators once the operator has commenced the performance of the duties described in subsections 1 and 2, and inform the association for operators that the duties described in subsections 1 and 2 will be completed within a time mutually agreed upon by the operator and excavator.

Added to NAC by Pub. Utilities Comm'n by R156-03, eff. 8-25-2004; A by R115-24A, eff. 9/16/2024

NRS 455.130, 703.025, 704.260, 704.280

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.