Nevada Administrative Code
Chapter 445A - Water Controls
UNDERGROUND INJECTION CONTROL
Construction, Operation, Monitoring and Abandonment
Section 445A.916 - Tests for mechanical integrity: Frequency
Universal Citation: NV Admin Code 445A.916
Current through September 16, 2024
Tests to demonstrate mechanical integrity must be conducted at least once each 5 years for the life of an injection well. The Director may require such tests more frequently if conditions of the operation so warrant. The holder of a permit shall notify the Director at least 45 days before the date upon which a test for mechanical integrity is to be performed.
Added to NAC by Environmental Comm'n, eff. 7-22-87-Substituted in revision for NAC 445.42735
NRS 445A.425, 445A.465, 445A.660
Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.