Nevada Administrative Code
Chapter 445A - Water Controls
PUBLIC WATER SYSTEMS
Design, Construction, Operation and Maintenance
Section 445A.67035 - Pumping facilities: Gauges and meters
Current through September 16, 2024
1. Except as otherwise provided in subsection 4, each pump must:
2. Each pumping station must have a device for measuring the rate of flow of discharge and the total flow.
3. A meter or flow sensor must have straight pipes installed both upstream and downstream. The length of the pipes must:
4. In lieu of a permanent standard or compound pressure gauge required by subsection 1, a pump may have a connection for a temporary pressure gauge and a pressure transducer with a local or remote indicator. A temporary pressure gauge installed pursuant to this subsection must be maintained on-site.
Added to NAC by Bd. of Health, eff. 2-20-97; A by R104-22A, eff. 12/9/2022
NRS 445A.860