Nevada Administrative Code
Chapter 445A - Water Controls
PUBLIC WATER SYSTEMS
Design, Construction, Operation and Maintenance
Section 445A.66715 - Performance and inspection of work on water project; certification of substantial compliance with approved plans and specifications
Current through September 16, 2024
1. Work on a water project must be:
2. Within 30 days after the completion of a water project, the supplier of water shall certify to the Division or the appropriate district board of health that the water project was completed in substantial compliance with the plans and specifications approved for the water project by the Division or the appropriate district board of health.
3. Not later than 90 days after the completion of a water project, the supplier of water shall supply to the Division or the appropriate district board of health one set of drawings of the water project as it was built.
Added to NAC by Bd. of Health, eff. 2-20-97; A by Environmental Comm'n by R194-08, 10-27-2009; A by R104-22A, eff. 12/9/2022
NRS 445A.860