An application for approval of a water project must contain:

1. Complete plans for the water project, including the details of any improvements to be made and all work to be performed on-site.

2. Complete specifications to supplement the plans for the water project.

3. A design report that:

(a) Describes the water project and basis for design of the water project;

(b) Provides the criteria for design, data and other pertinent information defining the water project; and

(c) Establishes the adequacy of the proposed water project to meet the needs of the public water system.

4. Chemical, physical, bacteriological and radiological analyses of any new sources of water which are proposed to be used, which:

(a) Are conducted by a properly certified laboratory; and

(b) Indicate that the water complies with the provisions of NAC 445A.450 to 445A.492, inclusive.

5. The requirements for fire flow and fire demand.

6. Any other pertinent information required by the Division or the appropriate district board of health to evaluate the application.

Added to NAC by Bd. of Health, eff. 2-20-97; A by Environmental Comm'n by R194-08, 10-27-2009

NRS 445A.860

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.